After being packed into 11 crates and travelling from Neuhausen, Germany to Baltimore by boat, and onto its final destination by truck back in December, a 20-foot-long, 135,000 lb. industrial machine from Zimmermann was moved into place over the course of several hours at the Connecticut Center for Advanced Technology.
Imported from the CTE archive to seed discussion on MFGAxis.
Originally published on CTE: 2017-02-08
CTE source: https://ctemag.com/news/ccat-installs-20-ft-135000-pound-zimmermann-machine/
Legacy path: /ccat-installs-20-ft-135000-pound-zimmermann-machine