MFGAxis

Newsroom

Control and Drive System Replacements

These state-of-the-art components improve the productivity and reliability of these critical machines and increase their service life by 15 to 20 years. A new control and drive system can increase machine downtime to 95 percent, with a payback period of 12 to 18 months. These replacements can be done for a fraction of the cost of a new machine – one-fourth to one-fifth of the cost, on average.

Source Attribution

Source: Cutting Tool Engineering

MFGAxis keeps this page focused on the manufacturing discussion layer. Source material should stay attributed, linked when a suitable source URL is available, and limited to excerpt or summary on MFGAxis.

These state-of-the-art components improve the productivity and reliability of these critical machines and increase their service life by 15 to 20 years. A new control and drive system can increase machine downtime to 95 percent, with a payback period of 12 to 18 months. These replacements can be done for a fraction of the cost of a new machine – one-fourth to one-fifth of the cost, on average.

Discussion

Discuss this on MFGAxis

Read replies tied to this source content and add manufacturing context without duplicating the original article, video, or release.

0 replies 0 voices
MFGAxis member April 11, 2026
Member

These state-of-the-art components improve the productivity and reliability of these critical machines and increase their service life by 15 to 20 years. A new control and drive system can increase machine downtime to 95 percent, with a payback period of 12 to 18 months. These replacements can be done for a fraction of the cost of a new machine – one-fourth to one-fifth of the cost, on average.

No comments yet. Start the discussion on MFGAxis.

Create a post

Share a question, an idea, a photo or a video with the network.

Continue with innoNET